FAQ · Bocce Courts

    How much maintenance does a bocce court need?

    Quick answer

    Brushing, light watering, and annual topdressing. Constant re-leveling means the base was built wrong.

    A properly built court needs periodic brushing or dragging to redistribute the surface, light watering to keep a shell or DG surface binding, and an annual topdressing to replace displaced fines. Keep the drainage gap under the side boards clear and reseal hardwood boards every few years. Courts that demand constant re-leveling were built without a leveling course or without proper compaction — that is a construction issue, not a maintenance one.
    Related pages
    More

    Related questions

    Build & Price

    Design your court and see pricing.

    Use the configurator to pick a size, base, and upgrades. Get an instant price range and send the brief to our build team.